In today’s high-tech industries—from biopharmaceuticals and biotechnology to advanced electronics manufacturing—the integrity of your cleanroom environment is not just a facility asset: it’s a competitive differentiator. If your laboratory or production facility relies on a controlled environment, then the choices you make around design, fabrication, and assembly will pay dividends in uptime, regulatory compliance and long-term cost control.
Understanding Why Cleanroom Quality Matters
Cleanrooms underpin the reliability of processes and products in contamination-sensitive areas. Whether you are developing a new cell-therapy line, producing semiconductors or fabricating precision optics, failures in clean-environment control can lead to costly scrap, regulatory issues or downtime.
What sets apart a good cleanroom from an outstanding one? It’s the combination of: robust design, precise fabrication, repeatable assembly in a controlled factory, and certification to key standards (such as CE, ISO, UL) that underpins trust and performance.
Meet Dersion: 20 Years of Cleanroom Expertise
At Dersion, we bring over 20 years of experience in smart cleanroom manufacturing. Our factory spans 20,000 m² of clean-room manufacturing space, and features German-made TRUMPF sheet-metal equipment for precision components. In addition, we house a 1,000 m² “10,000 level” (i.e., ISO 7) assembly workshop, enabling high-integrity system builds in-house.
What this means for you:
-
One-stop service — from design through fabrication and assembly.
-
Professional design team offering free design solutions and detailed quotations.
-
Full certification (CE, ISO, UL) so you’re covered for global regulatory compliance.
-
Smart manufacturing with premium equipment and controlled environments, enabling repeatable, high-quality modules.
Key Advantages for Your Cleanroom Project
1. Precision fabrication and modularity
Using TRUMPF sheet-metal systems, we fabricate cleanroom walls, ceilings, and modular systems to tight tolerances. Modular cleanroom systems reduce onsite installation time and minimize disruption—critical when production lines are involved.
2. Controlled-environment assembly
Our 10,000-level assembly workshop means critical sub-assemblies are built under clean conditions, reducing contamination risk and ensuring your install is smoother, faster, and more reliable.
3. Certifications and one-stop delivery
With CE, ISO and UL certifications, and a one-stop workflow, you avoid juggling multiple suppliers and certifications. You get a cleanroom system from a trusted source with accountability, traceability and streamlined delivery.
Best-Practice Considerations for Your Cleanroom Project
-
Define your cleanroom class (ISO 5, ISO 6, ISO 7, etc) based on your process requirements.
-
Plan for airflow, filtration and pressure control right from the start—cleanroom walls alone are not enough.
-
Modular build vs in-site construction — modular systems, like those offered by Dersion, shorten downtime and improve quality consistency.
-
Quality fabrication and certified equipment reduce risk of rework or failure.
-
Certification and documentation — ensure your supplier provides full documentation for regulatory audits and operational validation.
Why Your Choice of Manufacturer Matters
Selecting the right manufacturer influences not only cost and schedule, but long-term operational cost, maintenance and reliability. With Dersion you gain:
-
Deep cleanroom factory experience (20 years)
-
Smart manufacturing infrastructure for precision and scale
-
Dedicated design team for tailored solutions
-
Global regulatory compliance support
Call to Action
If you’re planning a new cleanroom installation or upgrade—whether for a laboratory, biotech manufacturing floor or electronics clean-environment—let’s talk. At Dersion we provide free design consultation, detailed quotations, and full project support from conception through delivery.
Send us your enquiry today to explore how we can partner to build a cleanroom that meets your exacting standards and accelerates your manufacturing success.
Post time: Oct-31-2025




